Construction

Here are our proposals to construct house, you can choose a plan villa below based on the budget you have and materials to use.

The delivery time is 4 months for the smallest villa to 9 months for most.

We are also open to proposals for your architects plans or master builders.

Villa Ravinala

Plan Ravinala villa sqm.

plan villa ravinala 84m²

Villa Vala Velogno

Plan Vela Velogno villa 89 sqm.

villa vela velogno de 89 m²

Villa Ibiscus

Plan Ibiscus villa 127 sqm.

villa Ibiscus avec piscine

Villa Bougainvillier

Plan Bougainvillier villa 260 sqm.

villa bougainvillier 260 m²

Villa Vanille

Plan Vanille villa 265 sqm.

villa vanille 265m²

Villa Ylang Ylang

Plan Ylang Ylang villa 480 m².

villa Ylang Ylang de 480 m²

Descriptive :

1 – Land Permits and construction license.
2 – Floor Cleaning.
3 – reinforced concrete foundation.
4 – Columns and walls of reinforced concrete foundation.
5 – Roof: tile waterproof concrete with wooden frame covered Ravinala typical of tropical countries.
6 – interior and exterior walls.
7 – Choice of floor covering: tiles, wood flooring, stained and waxed smooth cement.
8 – Installation of plumbing fixtures and plumbing.

9 – Potable water tank 5 cubic meters
10 – Doors and sliding aluminum or wood windows.
11 – Electrical System centralized. Generator and / or solar panels with lifeguard on unserviced land electricity.
12 – built furniture, wardrobes in each bedroom, full kitchen with gas stove and refrigerator.
Beds, tables, chairs, armchairs: Local manufacture of wood.

Terms of payment :

20% at the beginning of construction.
40% to the roof.
20% to finish the work.
20% to the keys.